switchdev: Adding complete operation to deferred switchdev ops
When using switchdev deferred operation (SWITCHDEV_F_DEFER), the operation
is executed in different context and the application doesn't have any way
to get the operation real status.
Adding a completion callback fixes that. This patch adds fields to
switchdev_attr and switchdev_obj "complete_priv" field which is used by
the "complete" callback.
Application can set a complete function which will be called once the
operation executed.
Signed-off-by: Elad Raz <[email protected]>
Signed-off-by: Jiri Pirko <[email protected]>
Reviewed-by: Ido Schimmel <[email protected]>
Acked-by: Nikolay Aleksandrov <[email protected]>
Signed-off-by: David S. Miller <[email protected]>